Sentinel Monitoring

DSUM 4.0 · Module 15 · T5-RIGID Governance

Release Management & System Monitoring

Release Posture

Authority: AC-1 (S. Jason Prohaska)

Classification: T5-RIGID | ENTERPRISE-FINAL

Mode: APPEND-ONLY · FAIL-CLOSED · NO PLACEHOLDERS

Version: 3.0

Canonical Timestamp: 2026-02-05T18:10:00+01:00

Purpose

This module defines the current release posture for the ETHRAEON system. Release posture establishes the operational state, frozen artifacts, and change control requirements for production surfaces.

Current Release State

2.1 System Version

AttributeValue
SystemETHRAEON ΔSUM
Version3.0
ClassificationT5-RIGID
PostureENTERPRISE-FINAL
Release Date2026-02-05

2.2 Frozen Artifacts

The following artifacts are frozen and require full change control workflow for modification:

ArtifactPathSHA-256Status
SOCP/var/www/subdomains/socp/index.htmle72968ca4b45c3446269fdc4e77d09ba2ffd8ffdddbe2e81c45d42e40d02c36dFROZEN
Main Site/var/www/www_root/index.html[Registered in manifest]FROZEN
Control Panel/var/www/control/index.html[Registered in manifest]FROZEN
Analyst QA/var/www/analyst/analyst-qa.html[Registered in manifest]FROZEN
Vector/var/www/vector.ethraeon.ai/index.html[Registered in manifest]FROZEN
PuntoDAC/var/www/puntodac/index.html[Registered in manifest]FROZEN

2.3 Surface Summary

MetricCount
Total Surfaces Enumerated274
Unique Caddy Blocks259
HOLD Surfaces13
ACTIVE Surfaces[Computed from manifest]
RETIRED Surfaces[Computed from manifest]
Reconciliation RequiredTRUE

Posture Rules

3.1 Enterprise-Final Posture

Under ENTERPRISE-FINAL posture:

RuleDescription
No regressionsNo changes that reduce capability or quality
Frozen artifactsDesignated artifacts cannot be modified without workflow
HOLD enforcementHOLD surfaces display explicit hold page
Class enforcementAll surfaces must have valid classification
Monitoring requiredAll ACTIVE surfaces must be monitored

3.2 Change Control Requirements

Surface TypeChange AuthorityWorkflow Required
Frozen PRIMARYAC-1 onlyFull deployment pipeline
Non-frozen PRIMARYAC-1 approvalStandard deployment
OPERATORAC-1 or delegated adminStandard deployment
STAKEHOLDERAC-1 approvalStandard deployment
REFERENCEDelegated authoritySimplified deployment
SANDBOXDeveloperMinimal workflow
HOLDAC-1 onlyHold exit workflow

HOLD Surface Management

4.1 Current HOLD Surfaces

HOLD surfaces have been identified and require explicit hold pages:

CountStatus
Total HOLD13
Hold Pages Deployed[Verified count]
Pending Deployment[Remaining count]

4.2 HOLD Page Requirements

Every HOLD surface must display:

Source: ETHRAEON ΔSUM 4.0 — Full Compilation (2026-02-22)
Classification: T5-RIGID | ENTERPRISE-FINAL
Authority: AC-1 (S. Jason Prohaska)
← Back to Canon Index